706) 11/16/2006 Q85333 PRJ: Workspace Does Not Restore Additional Windows (Q85333)
The versions of Microsoft Project listed above are capable of opening more than one window on a single project file. Such windows are identified by the window name followed by ":x", where x is the instance of the window. If more than one 707) 1/18/2007 Q86287 PRJ: How Fiscal Dates Are Shown on a Timescaled View (Q86287)
In the versions of Microsoft Project listed above, when the fiscal year is set to start in a month other than January that is also before the current month, the current date may appear incorrect. When a fiscal year is specified, the current date 708) 10/24/2006 Q86346 PRJ: Differences in Feature Capacities for Microsoft Project 1.x - 2000 (Q86346)
This article lists some of the feature differences between Microsoft Project versions 1.x, 3.x, 4.x, 98, and 2000. Version: 2000 98 4.x 3.x 1.x Maximums ---- ---- ---- ---- ---- 709) 5/30/2006 Q88471 PRJ: Circular Relationship Stops Calculation (Q88471)
When Microsoft Project encounters a Circular Relationship message, it stops all calculation of the project. Microsoft Project cannot resolve schedule dates for tasks when there is a circular relationship message, so all calculations are 710) 8/16/2006 Q94276 PRJ: List Separator for MPX Files Can't Be a Space (Q94276)
If you are using Microsoft Project, you cannot open a file saved in the MPX file format if the file was saved with a space for the list separator. If the list separator is a space, you will receive the following error message when you attempt to open 711) 9/20/2007 Q97831 PRJ: Importing a Project Outline Structure (Q97831)
When you import files from a different application to Microsoft Project, you can include information that will allow Microsoft Project to generate a project outline structure for the imported file. 712) 6/8/2006 Q98903 PRJ: Changing Calendars That Have Calendar Exceptions (Q98903)
When you make global changes to a Microsoft Project Calendar, these changes may not be reflected in all dates. Microsoft Project will not automatically change dates that were selected individually and changed by selecting the Working and Nonworking 713) 1/23/2007 Q99256 PRJ: Date Pasted to Another Application in Wrong Format (Q99256)
When you copy a date from Microsoft Project and paste it in another application, it will be pasted with the date format that is set in the dialog box found on the View tab. (To locate the View tab, click Options on the Tools menu.) If 714) 9/19/2007 Q100647 PRJ: Pasting Microsoft Project Tables into Microsoft Word (Q100647)
When you copy information from a Microsoft Project table (task sheet, resource sheet, and so on) and paste this information to the Clipboard, it is formatted in tab-delimited columns. While you can paste this information into a spreadsheet and 715) 8/2/2007 Q101495 PRJ: How Percent Complete Is Calculated for Nested Summary Tasks (Q101495)
Microsoft Project calculates the Summary Level Percent Complete value based on its immediate subordinate tasks (summary and detail tasks). This method of calculation can cause the percent complete for a higher-level summary task to differ from a 716) 9/29/2007 Q103201 PRJ: BCWS Incorrect If Fix Cost Deleted After Plan Set (Q103201)
In Microsoft Project, BCWS (Budgeted Cost of Work Scheduled), BCWP (Budgeted Cost of Work Performed) and BAC [Budget At Completion (Planned Cost)] appear incorrect if the fixed cost for the task is deleted AFTER the plan is set. 717) 8/20/2007 Q107508 PRJ: Circular Relationship Error (Q107508)
When Microsoft Project encounters a circular relationship in a project field, you will receive the following error message Circular relationship in task Circular relationship in task and the following message will appear in the status bar 718) 9/30/2007 Q109414 PRJ: Linking Predecessor Field May Add Tasks Unexpectedly (Q109414)
After you delete a task, it may reappear in the project with the same information and the following characteristics: it appears with a one-day duration, it is scheduled to start on the same day as the project's start date, and its Name field is 719) 6/16/2006 Q112052 PRJ: Cannot Paste Link from WordPerfect to Microsoft Project (Q112052)
You cannot link information from WordPerfect for versions 5.1, 5.2 or 6.0 to another Microsoft Windows application, such as Microsoft Project for Windows. 720) 9/19/2007 Q112994 PRJ: Macro Recorder Does Not Record Window Commands (Q112994)
In Microsoft Project, if you use any of the following window commands while the macro recorder is running, nothing is recorded: Restore Move Size Minimize Maximize Scroll Split NOTE : This behavior applies